Camp Loopy 2012 Project Three
-
For our third month of Camp (7/27-8/27), we are knitting projects that have a minimum of 500 yards that includes two colors, and is a pattern that we've not knit before.
For our third month of Camp (7/27-8/27), we are knitting projects that have a minimum of 500 yards that includes two colors, and is a pattern that we've not knit before.